Thursday, November 12, 2026

GREENACRES BOULEVARD ROAD REPAIRS SCHEDULED TO BEGIN NOVEMBER 17

by BPT Staff
0 comments

Road repairs on Greenacres Boulevard are scheduled to begin Tuesday, November 17, as part of the City of Bossier City’s 2025 Streets and Drainage Improvements Program.

The contractor will begin work on the eastbound lanes of Greenacres Boulevard at the intersection of South Hardwick Drive. To safely complete the work, the intersections of South Hardwick Drive and Fairmont Drive with Greenacres Boulevard will be temporarily closed.

Residents traveling on Fairmont Drive should plan to use the following alternate routes:

  • Traffic on Fairmont Drive north of Greenacres Boulevard will be directed to use Maple Ridge.
  • Traffic on Fairmont Drive south of Greenacres Boulevard will be directed to use Southwood Drive.

Additionally, eastbound traffic on Greenacres Boulevard will be shifted to the westbound side of the roadway between Fairmont Drive and Airline Road. During this phase of construction, this section of Greenacres Boulevard will operate with two-way traffic.

The work is necessary to remove and replace a deteriorated section of roadway and is expected to take approximately one week, weather permitting.

Motorists are encouraged to use caution, follow posted signage and traffic control devices, and allow extra travel time when traveling through the area.

The City of Bossier City appreciates the public’s patience and cooperation as these roadway improvements are completed.

You may also like