Tuesday, July 8, 2025

LANE CLOSURE: LA 3 (Miller’s Bluff) bridge over Red River

by BPT Staff
0 comments

The Louisiana Department of Transportation and Development advises motorists that on Wednesday, July 16, 2025, the LA 2 (Miller’s Bluff) bridge over the Red River in Bossier Parish will be reduced to one lane.

This lane closure is scheduled to take place from approximately 8:00 a.m. to 3:00 p.m., and is necessary for routine bridge inspection.

This bridge is located approximately 3.3 miles east of US 71 (see included map).

Restrictions/Permits: This lane closure will allow vehicles 10 feet wide or smaller to pass through the inspection zone. Larger vehicles must utilize an alternate route.

Alternate Route: I-49 to LA 1 to LA 3094 to I-20 to US 371

This work will be performed WEATHER PERMITTING.

Safety reminder:

DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment. Remember to leave plenty of room between you and the vehicle in front of you.

Area residents should exercise caution when driving, walking, or biking near an active construction zone.

Additional information:

Call 511, visit www.511la.org, or download the Louisiana 511 mobile app for additional travel information. Out-of-state travelers may call 1-888-ROAD-511 (1-888-762-3511). Motorists may also monitor the LA DOTD website at www.dotd.la.gov, by selecting MyDOTD, or by visiting the DOTD Facebook and X (Twitter) pages.

You may also like

About Us

We’re a media company. We promise to tell you what’s new in the parts of modern life that matter. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. Sed consequat, leo eget bibendum sodales, augue velit.

@2022 – All Right Reserved. Designed and Developed byu00a0PenciDesign